Our Portfolio
Green City Action Plan / photo: pexels.com
Collaboration on offshore wind farm construction
From March to September 20204, on behalf of Equinor, we prepared offshore wind farm construction project documents for investment bank financing, in accordance with IFC, EBRD, EIB and Equator Principles standards: LRF for offshore components (offshore, Livelihood Restoration Framework), LRP for onshore components (onshore, Livelihood Restoration Plan), Stakeholders Engagement Plan (SEP, Stakeholders Engagement Plan), Indigenous people analysis, Cultural Heritage Management Plan (CHMP, Cultural Heritage Management Plan), Non Technical Summary (NTS, Non Technical Summary) and Project Summary (CNT), Environmental and Social Management and Monitoring Plan (ESMMP, Environmental and Social Management and Monitoring Plan). We worked in close collaboration with the Polenergia and Equinor teams. The project was carried out together with Multiconsult Polska, which prepared for the investor: a social baseline study of the project (Social baseline study), a biodiversity impact assessment (Biodiversity Assessment), and is currently preparing a Waste Management Plan (Waste Management Plan) and a Traffic Management Plan (Traffic Management Plan).From April to June 2024, we conducted social surveys among tourism operators and fishermen for the Livelihood Restoration Plan (LRP) and its evaluation. The surveys were carried out in accordance with IFC, EBRD, EIB and Equator Principles standards. Our activities covered the ports of Ustka, Łeba and Władysławowo. All research was preceded by meetings with fishermen and the investor (Baltic Power sp. z o.o.). Project carried out on behalf of the investor in cooperation with Ramboll UK, which is preparing the LRP.From January to March 20204, we conducted a Green Economy Transition Analysis and Paris Alignment Report for the construction of a multimodal terminal in Świnoujście. The project was carried out in accordance with the requirements of the IFC (International Finance Corporation) and the EBRD as part of Arup’s (Lenders Advisory) team advising the Banks.
Social surveys for Baltic Power
From April to June 2024, we conducted social surveys among tourism operators and fishermen for the Livelihood Restoration Plan (LRP) and its evaluation. The surveys were carried out in accordance with IFC, EBRD, EIB and Equator Principles standards. Our activities covered the ports of Ustka, Łeba and Władysławowo. All research was preceded by meetings with fishermen and the investor (Baltic Power sp. z o.o.). Project carried out on behalf of the investor in cooperation with Ramboll UK, which is preparing the LRP.From January to March 20204, we conducted a Green Economy Transition Analysis and Paris Alignment Report for the construction of a multimodal terminal in Świnoujście. The project was carried out in accordance with the requirements of the IFC (International Finance Corporation) and the EBRD as part of Arup’s (Lenders Advisory) team advising the Banks.
Analysis of the construction of a multimodal terminal in Świnoujście
From January to March 20204, we conducted a Green Economy Transition Analysis and Paris Alignment Report for the construction of a multimodal terminal in Świnoujście. The project was carried out in accordance with the requirements of the IFC (International Finance Corporation) and the EBRD as part of Arup’s (Lenders Advisory) team advising the Banks.
ESDD analysis for wind farms
From November 2023 to February 2024, we conducted an ESDD for the construction of an offshore wind farm tower factory in Gdansk. The analysis was carried out for the needs of the investment banks, as required by the EIB and EBRD (in ENG: EIB and EBRD).
Location assessment for SMR projects
Due Dilligence for a fundamental flaw in the location – for the construction of SMR projects in Poland we carried out in August-September 2023. During this time, we analysed potential locations for SMR construction. We ruled out some already after the first exploratory works, for others we developed a DD, analysing geological, geotechnical, seismic, hydrological, social and natural conditions aspects and other issues arising from the location regulation and good practice. In our work, we used available data and also went to the field.
Cooperation with ZUOP
Once again we have advised the Radioactive Waste Disposal Facility (ZUOP). We started our cooperation with environmental issues, this time dealing with the new surface radioactive waste repository.
Site audit for nuclear power plants in Poland
As part of our work, we verified the presence of fundamental flaws, i.e. the factors listed in paragraph five of the location regulation, on the basis of publicly available data. We also verified the risk of environmental and water impact problems.
Analysis for investment banks
We participated in the development of the environmental and social Due Diligence, including the GET (Green Economy Transition) analysis, i.e., analysis of the project’s compliance with environmental requirements. The documents were developed in accordance with the standards and policies of investment banks: the European Investment Bank and the European Bank for Reconstruction and Development. Basing on documents prepared by us, these banks became financially involved in the implementation extension of tram network in Krakow and construction of a tram line to Mistrzejowice.
The first GCAP (Green City Action Plan) in Poland
We participated in developing the first GCAP document in Poland, which was adopted by the Wałbrzych City Council in mid-December 2022. As part of over a year and a half of work with Arup experts and in cooperation with the EBRD and the City of Wałbrzych, we have prepared Technical Assessment Report (TAR) containing, among others: database of project indicators, analysis of the city’s condition in terms of the environment, air emissions, water quality, transport, energy and buildings, Smart Maturity Assessment (SMA), and Gender Report.
Negotiations of an intergovernmental agreement
On the last day of September 2022, The General Director for Environmental Protection upheld the decision on environmental conditions regarding further mining of the Turów lignite deposit. In the process of obtaining the decision on environmental conditions and the decision of GDOŚ, the investor was represented by Anita Kuliś, who has been supporting the project since mid-2018, coordinating the implementation of the documents, such as the environmental impact report, and changes to the local area development plan. Anita actively participated in meetings with administrative authorities, in hearings open to the public, as well as cross-border consultations with the Czech Republic and the Federal Republic of Germany pursuant to Art. 5 of the Espoo Convention. As the only external expert, she worked together with the government and investor teams. She also participated in the negotiations of the intergovernmental agreement between the Czech Republic and the Republic of Poland and the agreement between the investor and the Ministry of State Assets.
Workshops on preparing documentation
In September 2022, Anita Kuliś co-conducted workshops for the teams of Polska Grupa Górnicza, Jastrzębska Spółka Węglowa and Tauron on preparing documentation for the environmental impact assessment procedure. Workshops organized by the Mining Chamber of Industry and Commerce took place in Wisła and were devoted to specific problems faced by investors. They were also attended by representatives of the Central Mining Institute – Research Institute, who are preparing documents for these investors.
Strategy for 2022-2030 for the capital group
We participated in the development of the Strategy for 2022-2030 for Jastrzębska Spółka Węglowa SA. Works performed by our team include:
– analysis of the challenges facing the JSW Capital Group in the perspective to 2030 and 2050 resulting from changes in the regulatory and legal environment, including issues related to the principle of climate neutrality, ultimately resulting in a departure from energy coal and coking coal
– analysis of possible sources of revenue diversification for the JSW Capital Group, e.g. by entering the segment of renewable energy sources and other technologies
– co-development of the Environmental Strategy for JSW SA as an integral part of the entire strategy for the capital group.
Technical Assessment Report (TAR)
We have prepared a Technical Assessment Report (TAR) for the Green City Action Plan (GCAP) in accordance with the requirements of the European Bank for Reconstruction and Development. The report was made for a city with a population of over 1 million (confidential data).
Evaluation of documents - nuclear power plant construction project
From October 2019 to February 2021, Anita Kuliś assessed documents prepared for the purpose of characterizing the location for constructing a nuclear power plant with the capacity of over 3,000 MW in Asia. During this time, she analysed a number of documents regarding the assessment of environment, including the marine environment, in terms of the requirements of the EU, investment banks and the International Atomic Energy Agency (IAEA); project information card and selected chapters of the environmental impact report (confidential data).
Analysis of the construction of a multimodal terminal in Świnoujście
From January to March 20204, we conducted a Green Economy Transition Analysis and Paris Alignment Report for the construction of a multimodal terminal in Świnoujście. The project was carried out in accordance with the requirements of the IFC (International Finance Corporation) and the EBRD as part of Arup’s (Lenders Advisory) team advising the Banks.
ESDD analysis for wind farms
From November 2023 to February 2024, we conducted an ESDD for the construction of an offshore wind farm tower factory in Gdansk. The analysis was carried out for the needs of the investment banks, as required by the EIB and EBRD (in ENG: EIB and EBRD).
Location assessment for SMR projects
Due Dilligence for a fundamental flaw in the location – for the construction of SMR projects in Poland we carried out in August-September 2023. During this time, we analysed potential locations for SMR construction. We ruled out some already after the first exploratory works, for others we developed a DD, analysing geological, geotechnical, seismic, hydrological, social and natural conditions aspects and other issues arising from the location regulation and good practice. In our work, we used available data and also went to the field.
Cooperation with ZUOP
Once again we have advised the Radioactive Waste Disposal Facility (ZUOP). We started our cooperation with environmental issues, this time dealing with the new surface radioactive waste repository.
Site audit for nuclear power plants in Poland
As part of our work, we verified the presence of fundamental flaws, i.e. the factors listed in paragraph five of the location regulation, on the basis of publicly available data. We also verified the risk of environmental and water impact problems.
Analysis for investment banks
We participated in the development of the environmental and social Due Diligence, including the GET (Green Economy Transition) analysis, i.e., analysis of the project’s compliance with environmental requirements. The documents were developed in accordance with the standards and policies of investment banks: the European Investment Bank and the European Bank for Reconstruction and Development. Basing on documents prepared by us, these banks became financially involved in the implementation extension of tram network in Krakow and construction of a tram line to Mistrzejowice.
The first GCAP (Green City Action Plan) in Poland
We participated in developing the first GCAP document in Poland, which was adopted by the Wałbrzych City Council in mid-December 2022. As part of over a year and a half of work with Arup experts and in cooperation with the EBRD and the City of Wałbrzych, we have prepared Technical Assessment Report (TAR) containing, among others: database of project indicators, analysis of the city’s condition in terms of the environment, air emissions, water quality, transport, energy and buildings, Smart Maturity Assessment (SMA), and Gender Report.
Negotiations of an intergovernmental agreement
On the last day of September 2022, The General Director for Environmental Protection upheld the decision on environmental conditions regarding further mining of the Turów lignite deposit. In the process of obtaining the decision on environmental conditions and the decision of GDOŚ, the investor was represented by Anita Kuliś, who has been supporting the project since mid-2018, coordinating the implementation of the documents, such as the environmental impact report, and changes to the local area development plan. Anita actively participated in meetings with administrative authorities, in hearings open to the public, as well as cross-border consultations with the Czech Republic and the Federal Republic of Germany pursuant to Art. 5 of the Espoo Convention. As the only external expert, she worked together with the government and investor teams. She also participated in the negotiations of the intergovernmental agreement between the Czech Republic and the Republic of Poland and the agreement between the investor and the Ministry of State Assets.
Workshops on preparing documentation
In September 2022, Anita Kuliś co-conducted workshops for the teams of Polska Grupa Górnicza, Jastrzębska Spółka Węglowa and Tauron on preparing documentation for the environmental impact assessment procedure. Workshops organized by the Mining Chamber of Industry and Commerce took place in Wisła and were devoted to specific problems faced by investors. They were also attended by representatives of the Central Mining Institute – Research Institute, who are preparing documents for these investors.
Strategy for 2022-2030 for the capital group
We participated in the development of the Strategy for 2022-2030 for Jastrzębska Spółka Węglowa SA. Works performed by our team include:
– analysis of the challenges facing the JSW Capital Group in the perspective to 2030 and 2050 resulting from changes in the regulatory and legal environment, including issues related to the principle of climate neutrality, ultimately resulting in a departure from energy coal and coking coal
– analysis of possible sources of revenue diversification for the JSW Capital Group, e.g. by entering the segment of renewable energy sources and other technologies
– co-development of the Environmental Strategy for JSW SA as an integral part of the entire strategy for the capital group.
Technical Assessment Report (TAR)
We have prepared a Technical Assessment Report (TAR) for the Green City Action Plan (GCAP) in accordance with the requirements of the European Bank for Reconstruction and Development. The report was made for a city with a population of over 1 million (confidential data).
Evaluation of documents - nuclear power plant construction project
From October 2019 to February 2021, Anita Kuliś assessed documents prepared for the purpose of characterizing the location for constructing a nuclear power plant with the capacity of over 3,000 MW in Asia. During this time, she analysed a number of documents regarding the assessment of environment, including the marine environment, in terms of the requirements of the EU, investment banks and the International Atomic Energy Agency (IAEA); project information card and selected chapters of the environmental impact report (confidential data).
A tram line to Mistrzejowice/photo: press service
Cooling towers/photo: pexels.com